The Most Critical Path in a PERT Network
Authors:H M Soroush
Institution:1.Clemson University,USA
Abstract:The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a project by a given deadline. However, in general, such a path is not the ‘most critical’ path and does not provide the smallest estimate for the probability of completion time. This paper studies the ‘most critical path’ problem and formulates it as an optimal path problem in a deterministic network with a two-attribute fractional objective function. An exact solution approach is presented for the optimal path problem which also gives the solution to the most critical path problem. The illustrative examples as well as our computational results demonstrate that the proposed algorithm provides estimates for the probabilities of completion time that are much more accurate than those of the classical approach.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号