Problem of the Sand Production in a Producing Well |
| |
Authors: | S. B. Grafutko V. N. Nikolaevskii |
| |
Abstract: | The problem of sand production (dilatant-plastic reservoir fragmentation) in the process of pumping-out fluid through an uncased borehole is considered. Taking the dilatant change in reservoir porosity into account makes it possible to find a relation between the fluid and solid mass flow rates. There is no steady-state solution if the elasto-plastic boundary does not coincide with the supply contour. In this case a self-similar problem of well start-up with a constant production rate is considered. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |