Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
Institution:Department of Industrial Engineering, Amirkabir University of Technology, 424 Hafez Avenue, 15916-34311, Tehran, Iran
Abstract:This paper studies the scheduling problem in hybrid flow shop (HFS) environment. The sequence dependent family setup time (SDFST) is concerned with minimization of makespan and total tardiness. Production environments in real world include innumerable cases of uncertainty and stochasticity of events and a suitable scheduling model should consider them. Hence, in this paper, due date is assumed to be uncertain and its data follow a normal distribution. Since the proposed problem is NP-hard, two metaheuristic algorithms are presented based on genetic algorithm, namely: Non-dominated Sorting Genetic Algorithm (NSGAII) and Multi Objective Genetic Algorithm (MOGA). The quantitative and qualitative results of these two algorithms have been compared in different dimensions with multi phase genetic algorithm (MPGA) used in literature review. Experimental results indicate that the NSGAII performs very well when compared against MOGA and MPGA in a considerably shorter time.
Keywords:Hybrid flow shop scheduling  Multi-objective optimization  Sequence-dependent setup time  Stochastic modeling  Metaheuristic algorithms
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号