首页 | 本学科首页   官方微博 | 高级检索  
     


Scheduling open shops with parallel machines to minimize total completion time
Authors:B. NaderiS.M.T. Fatemi Ghomi  M. AminnayeriM. Zandieh
Affiliation:
  • a Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
  • b Department of Industrial Management, Accounting and Management Faculty, Shahid Beheshti University, G.C., Tehran, Iran
  • Abstract:
    This paper explores scheduling a realistic variant of open shops with parallel machines per working stage. Since real production floors seldom employ a single machine for each operation, the regular open shop problem is very often in practice extended with a set of parallel machines at each stage. The purpose of duplicating machines in parallel is to either eliminate or to reduce the impact of bottleneck stages on the overall shop efficiency. The objective is to find the sequence which minimizes total completion times of jobs. We first formulate the problem as an effective mixed integer linear programming model, and then we employ memetic algorithms to solve the problem. We employ Taguchi method to evaluate the effects of different operators and parameters on the performance of memetic algorithm. To further enhance the memetic algorithm, we hybridize it with a simple form of simulated annealing as its local search engine. To assess the performance of the model and algorithms, we establish two computational experiments. The first one is small-sized instances by which the model and general performance of the algorithms are evaluated. The second one consists of large-sized instances by which we further evaluate the algorithms.
    Keywords:Scheduling   Open shop   Parallel machines   Mathematical model   Mixed integer linear programming   Memetic algorithm   Taguchi method
    本文献已被 ScienceDirect 等数据库收录!
    设为首页 | 免责声明 | 关于勤云 | 加入收藏

    Copyright©北京勤云科技发展有限公司  京ICP备09084417号