首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Production scheduling with supply and delivery considerations to minimize the makespan
Authors:Xiuli Wang  TCE Cheng
Institution:1. School of Economics and Management, Nanjing University of Science and Technology, Nanjing, China;2. Department of Logistics, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
Abstract:In this paper we study a scheduling model that simultaneously considers production scheduling, material supply, and product delivery. One vehicle with limited loading capacity transports unprocessed jobs from the supplier’s warehouse to the factory in a fixed travelling time. Another capacitated vehicle travels between the factory and the customer to deliver finished jobs to the customer. The objective is to minimize the arrival time of the last delivered job to the customer. We show that the problem is NP-hard in the strong sense, and propose an O(n) time heuristic with a tight performance bound of 2. We identify some polynomially solvable cases of the problem, and develop heuristics with better performance bounds for some special cases of the problem. Computational results show that all the heuristics are effective in producing optimal or near-optimal solutions quickly.
Keywords:Scheduling  Supply and delivery  Heuristics  Performance bounds
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号