Integrated capacity and inventory management with capacity acquisition lead times |
| |
Authors: | Gergely Mincsovics Tarkan Tan Osman Alp |
| |
Affiliation: | 1. Department of Technology Management, Technische Universiteit Eindhoven, P.O. Box 513, 5600MB Eindhoven, The Netherlands;2. Industrial Engineering Department, Bilkent University, Bilkent, 06800 Ankara, Turkey |
| |
Abstract: | We model a make-to-stock production system that utilizes permanent and contingent capacity to meet non-stationary stochastic demand, where a constant lead time is associated with the acquisition of contingent capacity. We determine the structure of the optimal solution concerning both the operational decisions of integrated inventory and flexible capacity management, and the tactical decision of determining the optimal permanent capacity level. Furthermore, we show that the inventory (either before or after production), the pipeline contingent capacity, the contingent capacity to be ordered, and the permanent capacity are economic substitutes. We also show that the stochastic demand variable and the optimal contingent capacity acquisition decisions are economic complements. Finally, we perform numerical experiments to evaluate the value of utilizing contingent capacity and to study the effects of capacity acquisition lead time, providing useful managerial insights. |
| |
Keywords: | Inventory Production Capacity acquisition lead time Capacity management Flexible capacity |
本文献已被 ScienceDirect 等数据库收录! |
|