首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Project Management Duration/Resource Tradeoff Analysis: an Application of the Cut Search Approach
Authors:Jr" target="_blank">Steve PhillipsJr
Institution:1.George College, University System of Georgia,
Abstract:The paper presents an application oriented procedure for solving the project management duration/resource tradeoff problem. A procedure is presented for reducing a project from a normal to a crash duration state at a minimum amount of additional resource expenditure assuming a linear utilization functions. The procedure is network based using a graphical Cut Search Approach to locate the minimal resource level at each reduction in total project duration. Activity-on-arc networks and flow networks are utilized. The paper is presented for practical application and for conceptual development as compared to a theoretical treatment.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号