首页 | 本学科首页   官方微博 | 高级检索  
     检索      

低碳电网扩张策略:以南方电网公司为例
引用本文:马秋卓,李沁,宋海清.低碳电网扩张策略:以南方电网公司为例[J].运筹与管理,2017,26(2):106-116.
作者姓名:马秋卓  李沁  宋海清
作者单位:1.华南农业大学 经济管理学院,广东 广州 510642; 2.广东外语外贸大学,广东 广州 510420; 3.中山大学 岭南学院,广东广州 510275
基金项目:本研究受华南农业大学校长基金及华南农业大学青年骨干教师基金资助
摘    要:研究了需求随机环境下电力企业关于电源建设与电力调度的最优决策;考虑电源机组的能源结构约束与运营发电期内的碳排放总量约束,构建了以总成本最小化为目标的带补偿二阶段随机规划模型;定性分析了模型的最优解与装机容量等其它参数之间的联系;以南方电网公司为例,基于真实的数据并考虑政府的规划建议与企业自身的低碳化发展要求,利用情景生成法求解随机规划模型。结果反映了电力系统发展过程中环保绩效与总成本之间的矛盾之外,为企业在实践运作中计划期的电力建设决策以及运营期的发电决策提供了一些有价值的建议。

关 键 词:能源结构  碳排放  电网扩展  二阶段带补偿随机优化  
收稿时间:2014-10-07

Low-carbon Generation Grid Expansion Strategy: A Case Study from China Southern Power Grid
MA Qiu-zhuo,LI Qin,SONG Hai-qing.Low-carbon Generation Grid Expansion Strategy: A Case Study from China Southern Power Grid[J].Operations Research and Management Science,2017,26(2):106-116.
Authors:MA Qiu-zhuo  LI Qin  SONG Hai-qing
Institution:1.College of Economics and Management, South China Agricultural University, Guangzhou 510642, China; 2.Guangdong University of Foreign Studies, Guangzhou 510420, China; 3. Lingnan College, Sun Yat-sen University, Guangzhou 510275, China
Abstract:To describe the optimal grid’s decisions of generator construction and power generation under stochastic environment, a recourse model with respect to energy structure and emission constraints is developed to minimize the total cost within the production cycle. The relationship of generator capacity and optimal solution along with other parameters is analytically discussed. A real case study from the China Southern Power Grid is studied. To solve the stochastic programming model, a scenario generation method is addressed on the realistic data. In the meantime, the related government planning proposals and company’s low-carbon development schedules are considered while building the constraints. The result from the numerical analysis reflects the paradox from keeping economic development and controlling the emission. The suggestions concerning the power grid construction in planning horizon and generation strategy in operation period are provided with practical value.
Keywords:energy structure  carbon emission  power grid expansion  stochastic programming with recourse model  
本文献已被 CNKI 等数据库收录!
点击此处可从《运筹与管理》浏览原始摘要信息
点击此处可从《运筹与管理》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号