Adaptive policies for multi-mode project scheduling under uncertainty |
| |
Authors: | Pedro Godinho Fernando G. Branco |
| |
Affiliation: | a GEMF, Faculty of Economics, University of Coimbra, Av. Dias da Silva, 165, 3004-512 Coimbra, Portugal b Department of Civil Engineering, University of Coimbra, Rua Luís Reis Santos, 3030-788 Coimbra, Portugal |
| |
Abstract: | In this paper we propose an adaptive model for multi-mode project scheduling under uncertainty. We assume that there is a due date for concluding the project and a tardiness penalty for failing to meet this due date, and that several distinct modes may be used to undertake each activity. We define scheduling policies based on a set of thresholds. The starting time of the activity is compared with those thresholds in order to define the execution mode.We propose a procedure, based on the electromagnetism heuristic, for choosing a scheduling policy. In computational tests, we conclude that the adaptive scheduling policy found by using the model and the heuristic solution procedure is consistently better than the optimal non-adaptive policy. When the different modes have very different characteristics and there is a reasonable difference between the average duration of the project and the due date, the cost advantage of the adaptive policy becomes very significant. |
| |
Keywords: | Project scheduling Project management Metaheuristics Simulation |
本文献已被 ScienceDirect 等数据库收录! |
|