首页 | 本学科首页   官方微博 | 高级检索  
     


Discrete and continuous time representations and mathematical models for large production scheduling problems: A case study from the pharmaceutical industry
Authors:Hlynur Stefansson  Sigrun SigmarsdottirPall Jensson  Nilay Shah
Affiliation:a School of Science and Engineering, Reykjavik University, Reykjavik, Iceland
b Faculty of Engineering, University of Iceland, Reykjavik, Iceland
c Centre for Process Systems Engineering, Department of Chemical Engineering, Imperial College London, London, United Kingdom
Abstract:
The underlying time framework used is one of the major differences in the basic structure of mathematical programming formulations used for production scheduling problems. The models are either based on continuous or discrete time representations. In the literature there is no general agreement on which is better or more suitable for different types of production or business environments. In this paper we study a large real-world scheduling problem from a pharmaceutical company. The problem is at least NP-hard and cannot be solved with standard solution methods. We therefore decompose the problem into two parts and compare discrete and continuous time representations for solving the individual parts. Our results show pros and cons of each model. The continuous formulation can be used to solve larger test cases and it is also more accurate for the problem under consideration.
Keywords:Production   Scheduling   Mixed integer linear programming   Time representations
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号