排序方式: 共有2条查询结果,搜索用时 15 毫秒
1
1.
吴智 刘建北 秦中华 伍灵慧 陈昌 陈元柏 陈玛丽 陈锡辉 董明义 关北菊 黄杰 江晓山 金艳 李飞 李仁英 李小男 雷广坤 刘荣光 罗小兰 马骁妍 盛华义 孙汉生 唐晓 王岚 王靓 徐美杭 张建 章红宇 张银鸿 赵豫斌 赵平平 朱科军 朱启明 庄保安 《中国物理 C》2010,34(7):983-987
The BESⅢ drift chamber and its subsystems need a cosmic-ray test after the chamber construction to check the chamber construction quality,testing the joint operation of the whole system and the performance of the chamber.The noise performance,drift time and charge measurements,and the scanning of channels were examined specifically.The preliminary results of the test indicate that the whole system works well. 相似文献
2.
After the construction of the BESⅢ drift chamber, a long period of cosmic rays test is necessary to verify its performance. This also provides a good opportunity to integrate the detector readout electronics and Detector Control System (DCS) into a unified working system. The goal of the DCS is to guarantee reliable physics data quality and the safe operation of the detector. It monitors and controls the HV, gas, VME crates and the nvironmental variables. The upper-level system is mainly developed from LabVIEW and the lower-level system mainly uses MCU and PLC technology. The system is designed to be highly flexible and scalable so that it can be applied to other detectors with little or no change. In the immediate future, it will be integrated into the entire BESⅢ Slow Control System. 相似文献
1