首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到10条相似文献,搜索用时 125 毫秒
1.
We consider a batch scheduling problem on a single machine which processes jobs with resource dependent setup and processing time in the presence of fuzzy due-dates given as follows:1. There are n independent non-preemptive and simultaneously available jobs processed on a single machine in batches. Each job j has a processing time and a due-date.2. All jobs in a batch are completed together upon the completion of the last job in the batch. The batch processing time is equal to the sum of the processing times of its jobs. A common machine setup time is required before the processing of each batch.3. Both the job processing times and the setup time can be compressed through allocation of a continuously divisible resource. Each job uses the same amount of the resource. Each setup also uses the same amount of the resource.4. The due-date of each job is flexible. That is, a membership function describing non-decreasing satisfaction degree about completion time of each job is defined.5. Under above setting, we find an optimal batch sequence and resource values such that the total weighted resource consumption is minimized subject to meeting the job due-dates, and minimal satisfaction degree about each due-date of each job is maximized. But usually we cannot optimize two objectives at a time. So we seek non-dominated pairs i.e. the batch sequence and resource value, after defining dominance between solutions.A polynomial algorithm is constructed based on linear programming formulations of the corresponding problems.  相似文献   

2.
A single machine scheduling problem is studied. There is a partition of the set of n jobs into g groups on the basis of group technology. Jobs of the same group are processed contiguously. A sequence independent setup time precedes the processing of each group. Two external renewable resources can be used to linearly compress setup and job processing times. The setup times are jointly compressible by one resource, the job processing times are jointly compressible by another resource and the level of the resource is the same for all setups and all jobs. Polynomial time algorithms are presented to find an optimal job sequence and resource values such that the total weighted resource consumption is minimum, subject to meeting job deadlines. The algorithms are based on solving linear programming problems with two variables by geometric techniques.  相似文献   

3.
In many practical situations, batching of similar jobs to avoid setups is performed while constructing a schedule. This paper addresses the problem of non-preemptively scheduling independent jobs in a two-machine flow shop with the objective of minimizing the makespan. Jobs are grouped into batches. A sequence independent batch setup time on each machine is required before the first job is processed, and when a machine switches from processing a job in some batch to a job of another batch. Besides its practical interest, this problem is a direct generalization of the classical two-machine flow shop problem with no grouping of jobs, which can be solved optimally by Johnson's well-known algorithm. The problem under investigation is known to be NP-hard. We propose two O(n logn) time heuristic algorithms. The first heuristic, which creates a schedule with minimum total setup time by forcing all jobs in the same batch to be sequenced in adjacent positions, has a worst-case performance ratio of 3/2. By allowing each batch to be split into at most two sub-batches, a second heuristic is developed which has an improved worst-case performance ratio of 4/3. © 1998 The Mathematical Programming Society, Inc. Published by Elsevier Science B.V.  相似文献   

4.
《Applied Mathematical Modelling》2014,38(19-20):4602-4613
This article considers scheduling problems on a single machine with learning effect, deteriorating jobs and resource allocation under group technology (GT) assumption. We assume that the actual processing time of a job depends on the job position, the group position, the starting time and the amount of resource allocated to them concurrently, and the actual setup times of groups depend on the group position and the amount of resource allocated to them concurrently. Two resource allocation functions are examined for minimizing the weighted sum of makespan and total resource cost. We prove that the problems have polynomial solutions under the condition that the number of jobs in each group are the same.  相似文献   

5.
We study a problem of scheduling n jobs on a single machine in batches. A batch is a set of jobs processed contiguously and completed together when the processing of all jobs in the batch is finished. Processing of a batch requires a machine setup time dependent on the position of this batch in the batch sequence. Setup times and job processing times are continuously controllable, that is, they are real-valued variables within their lower and upper bounds. A deviation of a setup time or job processing time from its upper bound is called a compression. The problem is to find a job sequence, its partition into batches, and the values for setup times and job processing times such that (a) total job completion time is minimized, subject to an upper bound on total weighted setup time and job processing time compression, or (b) a linear combination of total job completion time, total setup time compression, and total job processing time compression is minimized. Properties of optimal solutions are established. If the lower and upper bounds on job processing times can be similarly ordered or the job sequence is fixed, then O(n3 log n) and O(n5) time algorithms are developed to solve cases (a) and (b), respectively. If all job processing times are fixed or all setup times are fixed, then more efficient algorithms can be devised to solve the problems.  相似文献   

6.
《Discrete Optimization》2008,5(3):594-604
The problem of scheduling groups of jobs on a single machine under the group technology assumption is studied. Jobs of the same group are processed contiguously and a sequence independent setup time precedes the processing of each group. All jobs have a common fixed due date, which can be either unrestrictively large or restrictively small. The objective is to minimize the total weighted earliness–tardiness. Properties of optimal solutions are established, and dynamic programming algorithms are derived to solve several special cases of this problem. Computational experiments show that the algorithms can easily solve problems with 500 groups of jobs and each group has 10 to 50 jobs on a standard PC.  相似文献   

7.
Problems of scheduling non-preemptable, independent jobs on parallel identical machines under an additional continuous renewable resource to minimize the makespan are considered. Each job simultaneously requires for its processing a machine and an amount (unknown in advance) of the continuous resource. The processing rate of a job depends on the amount of the resource allotted to this job at a time. The problem is to find a sequence of jobs on machines and, simultaneously, a continuous resource allocation that minimize the makespan. A heuristic procedure for allocating the continuous resource is used. The tabu search metaheuristic to solve the considered problem is presented. The results produced by tabu search are compared with optimal solutions for small instances, as well as with the results generated by simple search methods – multi-start iterative improvement and random sampling for larger instances.  相似文献   

8.
本文考虑下述由多工类工件组成的订单的单机排序问题:每一个客户提供一个由若干工件组成的订单,总共n个工件又分成k个类.当机器从加工某类中的工件转向加工不同于它的第i类工件时,需一调整时间si.每一订单有一给定的应交工时间,订单的完工时间定义为该定单所含全部工件完工时的时间.我们希望适当排列这n个工件,使得订单的迟后范围最小.相应这一排序问题,文中依不同的背景给出了以下二种模式:同类工件一起连续加工,工件的完工时间为其所属类中全部工件完工时的时间,用GT,Ba来表示;同类工件一起连续加工,工件的完工时间为其本身的完工时间,用GT,Ja来表示.对于这两种模式的排序同题,我们均证明了其NP-hard性并给出了对应的分枝定界算法.  相似文献   

9.
We study a single-machine stochastic scheduling problem with n jobs, in which each job has a random processing time and a general stochastic cost function which may include a random due date and weight. The processing times are exponentially distributed, whereas the stochastic cost functions and the due dates may follow any distributions. The objective is to minimize the expected sum of the cost functions. We prove that a sequence in an order based on the product of the rate of processing time with the expected cost function is optimal, and under certain conditions, a sequence with the weighted shortest expected processing time first (WSEPT) structure is optimal. We show that this generalizes previous known results to more general situations. Examples of applications to practical problems are also discussed.This work was partially supported by the Research Grants Council of Hong Kong under Earmarked Grants No. CUHK4418/99E and No. PolyU 5081/00E.  相似文献   

10.
提出需要安装时间的多功能机排序问题,一般情况下,这是NP-困难的;主要研究只有两台机器时一些特殊情况下的计算复杂性.根据加工集合为机器全集的工件组数的不同,分别给出多项式时间算法和分枝定界算法.对各工件组的工件数和加工时间都相等的情况,给出一个多项式时间的最优算法-奇偶算法,从而证明此问题是多项式时间可解的.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏