首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
本文研究一类具有特殊工件的平行机在线排序问题,目标是最小化最大完工时间.此模型有两种工件:正常工件和特殊工件.正常工件能够在m台平行机的任何一台机器上加工,而特殊工件仅能够在它唯一被指定的机器上加工.文中所有特殊工件的指定机器为M1.我们提供了竞争比为(2m2-2m 1)/(m2-m 1)的在线近似算法.当m=2时,算法是最好可能的.当m=3时,算法的竞争比为13/7≈1.857,并且提供了竞争比的下界(1 (平方根33))14≈1.686.  相似文献   

2.
Local search heuristics are developed for a problem of scheduling jobs on a single machine. Jobs are partitioned into families, and a set-up time is necessary when there is a switch in processing jobs from one family to jobs of another family. The objective is to minimize the number of late jobs. Four alternative local search methods are proposed: multi-start descent, simulated annealing, tabu search and a genetic algorithm. The performance of these heuristics is evaluated on a large set of test problems. The best results are obtained with the genetic algorithm; multi-start descent also performs quite well.  相似文献   

3.
In this paper we propose a hybrid branch and bound algorithm for solving the problem of minimizing mean tardiness for a single machine problem subject to minimum number of tardy jobs. Although the minimum number of tardy jobs is known, the subset of tardy job is not known. The proposed algorithm uses traditional branch and bound scheme where lower bounds on mean tardiness are calculated coupled with using the information that the number of tardy jobs is known. It also uses an insertion algorithm which determines the optimal mean tardiness once the subset of tardy jobs is specified. An example is solved to illustrate the developed procedure.  相似文献   

4.
This research focuses on the problem of scheduling jobs on two identical parallel machines that are not continuously available with the objective of minimizing total tardiness. After processing a given number of jobs, each machine requires a preventive maintenance task, during which the machine cannot process jobs. We present dominance properties and lower bounds, and develop a branch and bound algorithm using these properties and lower bounds as well as an upper bound obtained from a heuristic algorithm. Performance of the algorithm is evaluated through a series of computational experiments on randomly generated instances and results are reported.  相似文献   

5.
讨论工件的加工时间为常数,机器发生随机故障的单机随机排序问题,目标函数极小化工件的加权完工时间和的数学期望最小.考虑两类优先约束模型.在第一类模型中,设工件间的约束为串并有向图.证明了模块M的ρ因子最大初始集合I中的工件优先于模块中的其它工件加工,并且被连续加工所得的排序为最优排序,从而将Lawler用来求解约束为串并有向图的单机加权总完工时间问题的方法推广到机器发生随机故障的情况.在第二类模型中,设工件间的约束为出树优先约束.证明了最大家庭树中的工件优先于家庭树中其它的工件加工,并且其工件连续加工所得到的排序为最优排序并给出了最优算法.  相似文献   

6.
We consider the static single-facility scheduling problem where the processing times of jobs are a nondecreasing and differentiable function of their starting (waiting) times and the objective is to minimize the total elapsed time (makespan) in which all jobs complete their processing. We give a criterion for optimality of two jobs to be scheduled next to each other, and based on this criterion we propose a heuristic algorithm to solve the problem. The effectiveness of the algorithm is empirically evaluated for quadratic and exponential cost functions. In the quadratic case it is compared with the static heuristic algorithm proposed by Gupta and Gupta.  相似文献   

7.
This paper presents an alternative approach using genetic algorithm to a new variant of the unbalanced assignment problem that dealing with an additional constraint on the maximum number of jobs that can be assigned to some agent(s). In this approach, genetic algorithm is also improved by introducing newly proposed initialization, crossover and mutation in such a way that the developed algorithm is capable to assign optimally all the jobs to agents. Computational results with comparative performance of the algorithm are reported for four test problems.  相似文献   

8.
We consider supply chain scheduling problems where customers release jobs to a manufacturer that has to process the jobs and deliver them to the customers. The jobs are released on-line, that is, at any time there is no information on the number, release and processing times of future jobs; the processing time of a job becomes known when the job is released. Preemption is allowed. To reduce the total costs, processed jobs are grouped into batches, which are delivered to customers as single shipments; we assume that the cost of delivering a batch does not depend on the number of jobs in the batch. The objective is to minimize the total cost, which is the sum of the total flow time and the total delivery cost. For the single-customer problem, we present an on-line two-competitive algorithm, and show that no other on-line algorithm can have a better competitive ratio. We also consider an extension of the algorithm for the case of m customers, and show that its competitive ratio is not greater than 2m if the delivery costs to different customers are equal.  相似文献   

9.
In this paper, we consider the unbounded parallel-batch scheduling with rejection. A job is either rejected, in which case a certain penalty has to be paid, or accepted and processed in batches on a machine. The processing time of a batch is defined as the longest processing time of the jobs contained in it. Four problems are considered: (1) to minimize the sum of the total completion time of the accepted jobs and the total rejection penalty of the rejected jobs; (2) to minimize the total completion time of the accepted jobs subject to an upper bound on the total rejection penalty of the rejected jobs; (3) to minimize the total rejection penalty of the rejected jobs subject to an upper bound on the total completion time of the accepted jobs; (4) to find the set of all the Pareto optimal schedules. We provide a polynomial-time algorithm for the first problem. Furthermore, we show that all the other three problems are binary NP-hard and present a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme for them.  相似文献   

10.
研究具有若干固定工件和自由工件,其中固定工件必须在指定时间窗内加工,而自由工件具有不同交工的时间,并且其加工可以中断的单机排序问题,其目标是极小化工件的误工数.该问题可以表示为1|FB,rj,pmtn|∑j Uj.首先讨论了问题的几个重要性质,以此为基础建立了求解该问题的动态规划算法,其时间复杂度为O(n4+m log m),其中m和n分别是固定工件数和自由工件数.  相似文献   

11.
考虑了工件有到达时间且拒绝工件总个数不超过某个给定值的单机平行分批排序问题.在该问题中,给定一个工件集和一台可以进行批处理加工的机器.每个工件有它的到达时间和加工时间;对于每个工件来说要么被拒绝要么被接受安排在机器的某一个批次里进行加工;一个工件如果被拒绝,则需支付该工件对应的拒绝费用.为了保证一定的服务水平,要求拒绝工件的总个数不超过给定值.目标是如何安排被接受工件的加工批次和加工次序使得其最大完工时间与被拒绝工件的总拒绝费用之和最小.该问题是NP-难的,对此给出了伪多项式时间动态规划精确算法,2-近似算法和完全多项式时间近似方案.  相似文献   

12.
In this paper, the problem of sequencing jobs on a single machine to minimize the weighted number of tardy jobs is considered. Some new dominances between jobs are proposed and studied. A new branch and bound algorithm that can solve large problems, e.g. 85 jobs, is presented.  相似文献   

13.
The problem of sequencing jobs on a single machine to minimize total tardiness is considered. An algorithm, which decomposes the problem into subproblems which are then solved by dynamic programming when they are sufficiently small, is presented and is tested on problems with up to 100 jobs.  相似文献   

14.
We consider a scheduling model in which several batches of jobs need to be processed by a single machine. During processing, a setup time is incurred whenever there is a switch from processing a job in one batch to a job in another batch. All the jobs in the same batch have a common due date that is either externally given as an input data or internally determined as a decision variable. Two problems are investigated. One problem is to minimize the total earliness and tardiness penalties provided that each due date is externally given. We show that this problem is NP-hard even when there are only two batches of jobs and the two due dates are unrestrictively large. The other problem is to minimize the total earliness and tardiness penalties plus the total due date penalty provided that each due date is a decision variable. We give some optimality properties for this problem with the general case and propose a polynomial dynamic programming algorithm for solving this problem with two batches of jobs. We also consider a special case for both of the problems when the common due dates for different batches are all equal. Under this special case, we give a dynamic programming algorithm for solving the first problem with an unrestrictively large due date and for solving the second problem. This algorithm has a running time polynomial in the number of jobs but exponential in the number of batches.  相似文献   

15.
We consider the flow-shop scheduling problem. The objective is to schedule the jobs on the machines so that we minimize the time by which all jobs are completed. We studied and implemented different versions of the algorithm of Sevast'yanov based on linear programming to solve this problem. Using CPLEX, we did computational tests with random instances having up to 1000 jobs and 100 machines. If the size of the flow-shop scheduling problem is small or if the running time is not a critical factor, the Nawaz-Enscore-Ham approximation algorithm still performs better. But if the running time is an important factor, Sevast'yanov's algorithm can be a very good alternative especially in presence of very large scale instances with a relatively small number of machines.  相似文献   

16.
This paper deals with a problem of determining lot-sizes of jobs in a real-world job shop-scheduling in the presence of uncertainty. The main issue discussed in this paper is lot-sizing of jobs. A fuzzy rule-based system is developed which determines the size of lots using the following premise variables: size of the job, the static slack of the job, workload on the shop floor, and the priority of the job. Both premise and conclusion variables are modelled as linguistic variables represented by using fuzzy sets (apart from the priority of the job which is a crisp value). The determined lots’ sizes are input to a fuzzy multi-objective genetic algorithm for job shop scheduling. Imprecise jobs’ processing times and due dates are modelled by using fuzzy sets. The objectives that are used to measure the quality of the generated schedules are average weighted tardiness of jobs, the number of tardy jobs, the total setup time, the total idle time of machines and the total flow time of jobs. The developed algorithm is analysed on real-world data obtained from a printing company.  相似文献   

17.
We consider the single machine scheduling problem to minimize total completion time with fixed jobs, precedence constraints and release dates. There are some jobs that are already fixed in the schedule. The remaining jobs are free to be assigned to any free-time intervals on the machine in such a way that they do not overlap with the fixed jobs. Each free job has a release date, and the order of processing the free jobs is restricted by the given precedence constraints. The objective is to minimize the total completion time. This problem is strongly NP-hard. Approximability of this problem is studied in this paper. When the jobs are processed without preemption, we show that the problem has a linear-time n-approximation algorithm, but no pseudopolynomial-time (1 − δ)n-approximation algorithm exists even if all the release dates are zero, for any constant δ > 0, if P ≠ NP, where n is the number of jobs; for the case that the jobs have no precedence constraints and no release dates, we show that the problem has no pseudopolynomial-time (2 − δ)-approximation algorithm, for any constant δ > 0, if P ≠ NP, and for the weighted version, we show that the problem has no polynomial-time 2q(n)-approximation algorithm and no pseudopolynomial-time q(n)-approximation algorithm, where q(n) is any given polynomial of n. When preemption is allowed, we show that the problem with independent jobs can be solved in O(n log n) time with distinct release dates, but the weighted version is strongly NP-hard even with no release dates; the problems with weighted independent jobs or with jobs under precedence constraints are shown having polynomial-time n-approximation algorithms. We also establish the relationship of the approximability between the fixed job scheduling problem and the bin-packing problem.  相似文献   

18.
We consider on-line scheduling of unit time jobs on a single machine with job-dependent penalties. The jobs arrive on-line (one by one) and can be either accepted and scheduled, or be rejected at the cost of a penalty. The objective is to minimize the total completion time of the accepted jobs plus the sum of the penalties of the rejected jobs.We give an on-line algorithm for this problem with competitive ratio . Moreover, we prove that there does not exist an on-line algorithm with competitive ratio better than 1.63784.  相似文献   

19.
The problem of scheduling jobs on a single machine is considered. It is assumed that the jobs are classified into several groups and the jobs of the same group have to be processed contiguously. A sequence independent set-up time is incurred between each two consecutively scheduled groups. A schedule is specified by a sequence for the groups and a sequence for the jobs in each group. The quality of a schedule is measured by two critera ordered by their relative importance. The objective is to minimize the maximum cost, the secondary criterion, subject to the schedule is optimal with respect to total weighted completion time, the primary criterion. A polynomial time algorithm is presented to solve this bicriterion group scheduling problem. It is shown that this algorithm can also be modified to solve the single machine group scheduling problem with several ordered maximum cost criteria and arbitrary precedence constraints.  相似文献   

20.
井彩霞  张磊  刘烨 《运筹与管理》2014,23(4):133-138
考虑需要安装时间的平行多功能机排序问题。在该模型中,每个工件对应机器集合的一个子集,其只能在这个子集中的任一台机器上加工,称这个子集为该工件的加工集合;工件分组,同组工件具有相同的加工时间和加工集合,不同组中的工件在同一台机器上连续加工需要安装时间,目标函数为极小化最大完工时间。对该问题NP-难的一般情况设计启发式算法:首先按照特定的规则将所有工件组都整组地安排到各台机器上,然后通过在各机器间转移工件不断改进当前最大完工时间。通过与下界的比较检验算法的性能,大量的计算实验表明,算法是实用而有效的。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号