首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 421 毫秒
1.
In this work, we address the Manufacturing Cell Formation Problem (MCFP). Cellular Manufacturing is a production strategy that has emerged to reduce materials handling and set up times in order to reduce lead times in production systems and to improve customer??s service levels while reducing costs. We propose a GRASP heuristic to obtain lower bounds for the optimal solution of the problem. To evaluate the performance of the proposed method, we test the heuristic with different instances from the literature and compare the results obtained with those provided by other heuristic methods from the literature. According to the obtained results, the proposed GRASP procedure provides good quality lower bounds with reasonable computational effort.  相似文献   

2.
In the capacitated p-median problem (CPMP), a set of n customers is to be partitioned into p disjoint clusters, such that the total dissimilarity within each cluster is minimized subject to constraints on maximum cluster capacity. Dissimilarity of a cluster is the sum of the dissimilarities between each customer who belongs to the cluster and the median associated with the cluster. An effective variable neighbourhood search heuristic for this problem is proposed. The heuristic is characterized by the use of easily computed lower bounds to assess whether undertaking computationally expensive calculation of the worth of moves, within the neighbourhood search, is necessary. The small proportion of moves that need to be assessed fully are then evaluated by an exact solution of a relatively small subproblem. Computational results on five standard sets of benchmark problem instances show that the heuristic finds all the best-known solutions. For one instance, the previously best-known solution is improved, if only marginally.  相似文献   

3.
In this study, we consider a Resource Investment Problem with time/resource trade-offs in project networks. We assume that there is a single renewable resource and the processing requirement of an activity can be reduced by investing extra resources. Our aim is to minimize the maximum resource usage, hence, the total amount invested for the single resource, while meeting the pre-specified deadline. We formulate the problem as a mixed integer linear model and find optimal solutions for small-sized problem instances. For large-sized problem instances, we propose a heuristic solution procedure. We develop several lower bounds and use them to evaluate the performance of our heuristic procedure. The results of our computational experiments have revealed the satisfactory behaviour of our optimality properties, lower bounds and heuristic procedure.  相似文献   

4.
This paper describes an approach for generating lower bounds for the curriculum-based course timetabling problem, which was presented at the International Timetabling Competition (ITC-2007, Track 3). So far, several methods based on integer linear programming have been proposed for computing lower bounds of this minimization problem. We present a new partition-based approach that is based on the “divide and conquer” principle. The proposed approach uses iterative tabu search to partition the initial problem into sub-problems which are solved with an ILP solver. Computational outcomes show that this approach is able to improve on the current best lower bounds for 12 out of the 21 benchmark instances, and to prove optimality for 6 of them. These new lower bounds are useful to estimate the quality of the upper bounds obtained with various heuristic approaches.  相似文献   

5.
This paper presents a heuristic, which concentrates on solving a large-scale static dial-a-ride problem bearing complex constraints. In this heuristic, a properly organized local search strategy and a diversification strategy are used to improve initial solutions. Then the improved solutions can be refined further by an intensification strategy. The performance of this heuristic was evaluated by intensive computational tests on some randomly generated instances. Small gaps to the lower bounds from the column generation method were obtained in very short time for instances with no more than 200 requests. Although the result is not sensitive to the initial solution, the computational time can be greatly reduced if some effort is spent to construct a good initial solution. With this good initial solution, larger instances up to 2000 requests were solved in less than 10 hours on a popular personal computer.  相似文献   

6.
This paper deals with the uncapacitated multiple allocation hub location problem. The dual problem of a four-indexed formulation is considered and a heuristic method, based on a dual-ascent technique, is designed. This heuristic, which is reinforced with several specifical subroutines and does not require any external linear problem solver, is the core tool embedded in an exact branch-and-bound framework. Besides, the heuristic provides the branch-and-bound algorithm with good lower bounds for the nodes of the branching tree. The results of the computational experience (with the classical CAB and AP data sets) are included, showing the great effectiveness of this approach: instances with up to 120 nodes are solved.  相似文献   

7.
In this paper, we consider the problem of designing urban optical networks. In particular, given a set of telephone exchanges, we must design a collection of ring-stars, where each ring-star is a cycle composed of a telephone exchange, some customers, some transition points used to save routing costs and customers not on the cycle connected to the cycle by a single edge. The ring topology is chosen in many fiber optic communication networks since it allows to prevent the loss of connection due to a single edge or even a single node failure. The objective is to minimize the total cost of the optical network which is mainly due to the excavation costs. We call this problem Multi-Depot Ring-Star Problem (MDRSP) and we formulate it as an optimization problem in Graph Theory. We present lower bounds and heuristic algorithms for the MDRSP. Computational results on randomly generated instances and real-life datasets are also presented.  相似文献   

8.
In this paper, we study the crane scheduling problem for a vessel after the vessel is moored on a terminal and develop both exact and heuristic solution approaches for the problem. For small-sized instances, we develop a time-space network flow formulation with non-crossing constraints for the problem and apply an exact solution approach to obtain an optimal solution. For medium-sized instances, we develop a Lagrangian relaxation approach that allows us to obtain tight lower bounds and near-optimal solutions. For large-sized instances, we develop two heuristics and show that the error bounds of our heuristics are no more than 100%. Finally, we perform computational studies to show the effectiveness of our proposed solution approaches.  相似文献   

9.
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances within reasonable computation time. Thus, heuristics have become a popular research field. Up to now, however, upper bounds are not well researched. Therefore, most researchers evaluate their heuristics on the basis of a best known lower bound, but it is unclear how good the performance really is. With this contribution we close this gap and derive tight upper bounds on the basis of a Lagrangian relaxation of the resource constraints. We also use this approach as a basis for a heuristic and show that our heuristic as well as the cash flow weight heuristic proposed by Baroum and Patterson yield solutions very close to the optimum result. Furthermore, we discuss the proper choice of a test-bed and emphasize that discount rates must be carefully chosen to give realistic instances.  相似文献   

10.
The resource constrained shortest path problem (RCSP) consists of finding the shortest path between two nodes of an assigned network, with the constraint that traversing an arc of the network implies the consumption of certain limited resources. In this paper we propose a new heuristic for the solution of the RCSP problem in medium and large scale networks. It is based on the extension to the discrete case of the penalty function heuristic approach for the fast ε-approximate solution of difficult large-scale continuous linear programming problems. Computational experience on test instances has shown that the proposed penalty function heuristic (PFH) is very effective in the solution of medium and large scale RCSP instances. For all the tests reported it provides very good upper bounds (in many cases the optimal solution) in less than 26 iterations, where each iteration requires only the computation of a shortest path.  相似文献   

11.
This article proposes lower bounds, as well as a divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times (MSPS). The heuristic is tested on randomly generated instances and compared with a previously published tabu search algorithm. Results show that the proposed heuristic is much faster than tabu search while providing similar quality solutions.  相似文献   

12.
This paper considers the problem of locating M facilities on the unit square so as to minimize the maximal demand faced by each facility subject to closest assignments and coverage constraints. Focusing on uniform demand over the unit square, we develop upper and lower bounds on feasibility of the problem for a given number of facilities and coverage radius. Based on these bounds and numerical experiments we suggest a heuristic to solve the problem. Our computational results show that the heuristic is very efficient, as the average gap between its solutions and the lower bound is 4.34%.  相似文献   

13.
This paper focuses on the problem of scheduling n independent jobs on m identical parallel machines for the objective of minimizing total tardiness of the jobs. We develop dominance properties and lower bounds, and develop a branch and bound algorithm using these properties and lower bounds as well as upper bounds obtained from a heuristic algorithm. Computational experiments are performed on randomly generated test problems and results show that the algorithm solves problems with moderate sizes in a reasonable amount of computation time.  相似文献   

14.
In this paper, we investigate the weighted maximal planar graph (WMPG) problem. Given a complete, edge-weighted, simple graph, the WMPG problem involves finding a subgraph with the highest sum of edge weights that is maximal planar, namely, it can be embedded in the plane without any of its edges intersecting, and no additional edge can be added to the subgraph without violating its planarity. We present a new integer linear programming (ILP) model for this problem. We then develop a cutting-plane algorithm to solve the WMPG problem based on the proposed ILP model. This algorithm enables the problem to be solved more efficiently than previously reported algorithms. New upper bounds are also provided, which are useful in evaluating the quality of heuristic solutions or in generating initial solutions for meta-heuristics. Computational results are reported for a set of 417 test instances of size varying from 6 to 100 nodes including 105 instances from the literature and 312 randomly generated instances. The computational results indicate that instances with up to 24 nodes can be solved optimally in reasonable computational time and the new upper bounds for larger instances significantly improve existing upper bounds.  相似文献   

15.
We examine the problem of scheduling a given set of jobs on a single machine to minimize total early and tardy costs without considering machine idle time. We decompose the problem into two subproblems with a simpler structure. Then the lower bound of the problem is the sum of the lower bounds of two subproblems. A lower bound of each subproblem is obtained by Lagrangian relaxation. Rather than using the well-known subgradient optimization approach, we develop two efficient multiplier adjustment procedures with complexity O(nlog n) to solve two Lagrangian dual subproblems. A branch-and-bound algorithm based on the two efficient procedures is presented, and is used to solve problems with up to 50 jobs, hence doubling the size of problems that can be solved by existing branch-and-bound algorithms. We also propose a heuristic procedure based on the neighborhood search approach. The computational results for problems with up to 3 000 jobs show that the heuristic procedure performs much better than known heuristics for this problem in terms of both solution efficiency and quality. In addition, the results establish the effectiveness of the heuristic procedure in solving realistic problems to optimality or near optimality.  相似文献   

16.
The Balanced Academic Curriculum Problem (BACP) consists in assigning courses to teaching terms satisfying prerequisites and balancing the credit course load within each term. The BACP is part of the CSPLib with three benchmark instances, but its formulation is simpler than the problem solved in practice by universities. In this article, we introduce a generalized version of the problem that takes different curricula and professor preferences into account, and we provide a set of real-life problem instances arisen at University of Udine. Since the existing formulation based on a min–max objective function does not balance effectively the credit load for the new instances, we also propose alternative objective functions. Whereas all the CSPLib instances are efficiently solved with Integer Linear Programming (ILP) state-of-the-art solvers, our new set of real-life instances turns out to be much more challenging and still intractable for ILP solvers. Therefore, we have designed, implemented, and analyzed heuristics based on local search. We have collected computational results on all the new instances with the proposed approaches and assessed the quality of solutions with respect to the lower bounds found by ILP on a relaxed and decomposed problem. Results show that a selected heuristic finds solutions of quality at 9%–60% distance from the lower bound. We make all data publicly available, in order to stimulate further research on this problem.  相似文献   

17.
In this paper we study the NP-hard scheduling problem of minimizing total completion time in a two-machine flow shop. Five known lower bounds are discussed and two new ones are presented. A new dominance criterion is also proposed. Several versions of a branch and bound method are derived by applying, both individually and combined, these lower bounds. A heuristic procedure is also presented that uses a constructive O(n2) time method, which computes a good starting solution, together with a neighborhood search based on pairwise interchanges. Computational results show that the exact method can handle problems of up to 30 jobs in size within a reasonable amount of time and that the heuristic procedure has an average error of less than 0.5% from the optimal value and less than 2.7% from the lower bound.  相似文献   

18.
The multiple-choice multidimensional knapsack problem (MMKP) is a well-known NP-hard combinatorial optimization problem with a number of important applications. In this paper, we present a “reduce and solve” heuristic approach which combines problem reduction techniques with an Integer Linear Programming (ILP) solver (CPLEX). The key ingredient of the proposed approach is a set of group fixing and variable fixing rules. These fixing rules rely mainly on information from the linear relaxation of the given problem and aim to generate reduced critical subproblem to be solved by the ILP solver. Additional strategies are used to explore the space of the reduced problems. Extensive experimental studies over two sets of 37 MMKP benchmark instances in the literature show that our approach competes favorably with the most recent state-of-the-art algorithms. In particular, for the set of 27 conventional benchmarks, the proposed approach finds an improved best lower bound for 11 instances and as a by-product improves all the previous best upper bounds. For the 10 additional instances with irregular structures, the method improves 7 best known results.  相似文献   

19.
This research focuses on the problem of scheduling jobs on two identical parallel machines that are not continuously available with the objective of minimizing total tardiness. After processing a given number of jobs, each machine requires a preventive maintenance task, during which the machine cannot process jobs. We present dominance properties and lower bounds, and develop a branch and bound algorithm using these properties and lower bounds as well as an upper bound obtained from a heuristic algorithm. Performance of the algorithm is evaluated through a series of computational experiments on randomly generated instances and results are reported.  相似文献   

20.
The Traveling Umpire Problem (TUP) is a challenging combinatorial optimization problem based on scheduling umpires for Major League Baseball. The TUP aims at assigning umpire crews to the games of a fixed tournament, minimizing the travel distance of the umpires. The present paper introduces two complementary heuristic solution approaches for the TUP. A new method called enhanced iterative deepening search with leaf node improvements (IDLI) generates schedules in several stages by subsequently considering parts of the problem. The second approach is a custom iterated local search algorithm (ILS) with a step counting hill climbing acceptance criterion. IDLI generates new best solutions for many small and medium sized benchmark instances. ILS produces significant improvements for the largest benchmark instances. In addition, the article introduces a new decomposition methodology for generating lower bounds, which improves all known lower bounds for the benchmark instances.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号