首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
An auto-sleep system is defined by the following two properties:
  • 1.(i) a call for the system occurs randomly and intermittently
  • 2.(ii) the system automatically goes to sleep if there occurs no call during a prespecified time T.
It considers four states:
  • 1.(a) sleep
  • 2.(b) warm-up
  • 3.(c) nonusage
  • 4.(d) usage.
For such a system, the time to sleep has been discussed based on suitable criteria. This study extends the model for an auto-sleep system so that the model can deal with multi-usage states. With a view to determining an optimal time to sleep under the extended model, the expected energy consumed per unit time is formulated as a criterion to be minimized. The existence of an optimal time to sleep is examined under a general call distribution. Numerical examples are also provided for a Weibull as well as a log-normal call distribution.  相似文献   

2.
3.
We prove the following theorems:
  • 1)Any surgery of index one on u tight contact manifold (of dimension three) gives rise to a manifold which carries a natural tight contact structure.
  • 2)In a tight contact manifold, any two isotopic spheres which carry the same characteristic foliation are isotopic through a contact isolopy.
  • 3)In a tight contact manifold, any two isotopic spheres have isomorphic complements.
  相似文献   

4.
The overall flotation deinking process can be divided into four basic microprocesses:
  • 1.(1) collision or capture of an (ink) particle by an air bubble
  • 2.(2) adhesion of an (ink) particle to the air bubble by sliding
  • 3.(3) development of a three-phase contact at the air bubble/water/particle interface, and
  • 4.(4) bubble/particle stability or instability after an aggregate is formed each of these microprocesses have an associated probability that they will occur successfully in a flotation cell.
In this paper, the associated probabilities of each microprocess are employed in the development of a kinetic- or population balance-type model of the overall flotation process. The overall model contains two kinetic constants: the first, k1 governs the overall probability of a free ink particle successfully intercepting and adhering to an air bubble; the second, k2 is a measure of the probability that a bubble/particle aggregate pair will become unstable and split to yield a “new” free ink particle.The solution to the kinetic model is presented in terms of k1 and k2, which are themselves functions of system parameters such as bubble and particle physical properties (e.g., diameter, density), fluid properties (e.g., viscosity, surface tension), etc. From this solution, a definition of a theoretical flotation efficiency, as well as other system performance parameters are presented.  相似文献   

5.
We consider the common-knowledge paradox raised by Halpern and Moses: common knowledge is necessary for agreement and coordination, but common knowledge is unattainable in the real world because of temporal imprecision. We discuss two solutions to this paradox:
  • 1.(1) modeling the world with a coarser granularity, and
  • 2.(2) relaxing the requirements for coordination.
  相似文献   

6.
For second-hand products sold with warranty, the expected warranty cost for an item to the manufacturer, depends on
  • 1.(i) the age and/or usage as well as the maintenance history for the item
  • 2.(ii) the terms of the warranty policy.
The paper develops probabilistic models to compute the expected warranty cost to the manufacturer when the items are sold with free replacement or pro rata warranties.  相似文献   

7.
The following are consequences of the main results in this paper:
  • 1.(1) The number of countably compact, completely regular spaces of density κ is 222κ.
  • 2.(2) There are 22κ points in U(κ) (= space of uniform ultrafilters on κ), each of which has tightness 2κ in U(κ) and is a limit point of a countable subset of U(κ).
  • 3.(3) There are 22κ points in U(κ), each of which has tightness 2κ and is a weak P-point of κ1.
  • 4.(4) For each λ ⩽ κ there are at least 22λ · κ points in βκ, each of which has tightness 2λ in β κ and is a weak P-point of κ1. Moreover, under GCH there are at least 22λ · κλ such points.
  相似文献   

8.
《Historia Mathematica》2002,29(2):193-198
Analysis of the errors in two Old Babylonian “algebraic” problems shows
  • •that the computations were performed on a device where additive contributions were no longer identifiable once they had entered the computation;
  • •that this device must have been some kind of counting board or abacus where numbers were represented as collections of calculi;
  • •that units and tens were represented in distinct ways, perhaps by means of different calculi.
© 2002 Elsevier Science (USA).Eine Analyse der Rechenfehler in zwei altbabylonischen “algebraischen” Aufgaben läßt mehrere Rückschlüsse auf ein Hilfsmittel zu, das zur Durchführung von Rechnungen benutzt worden sein kann:
  • •Additive Beiträge waren nach ihrer Eintragung in die Rechnung nicht länger identifizierbar.
  • •Das Gerät war eine Art Rechenbrett, auf welchem Zahlen als Haufen von Rechensteinen erschienen.
  • •Einer und Zehner wurden in verschiedener Weise, evtl. mittels verschiedener Rechensteine repräsentiert.
© 2002 Elsevier Science (USA).MSC subject classification: 01A17.  相似文献   

9.
In this paper, we find subspaces of the Pixley-Roy space on the irrationals which are
  • 1.(1) a first countable ccc space which does not have a σ-linked base,
  • 2.(2) for each n>1, a first countable space which has a σ-n-linked base but which does not have a (σn+1)-linked base and
  • 3.(3) a first countable space which has, for each n>1, a σ-n-linked base but which does not have a σ-centered base.
It is consistent with ¬CH that (1) and (2) have cardinality ℵ1. (3) is constructed from a graph G on the continuum c which is not the union of countably many complete subgraphs but has no uncountable pairwise incompatible family of finite complete subgraphs (complete subgraphs A and B are compatible if there is a complete subgraph C which contains A and B).  相似文献   

10.
11.
This paper formulates the Dynamic Traffic Routing (DTR) problem as a real-time feedback control problem. Three different forms of the formulation are presented:
  • 1.(1) distributed parameter system form derived from the conservation law;
  • 2.(2) space discretized continuous lumped parameter form;
  • 3.(3) space and time discretized lumped parameter form.
These formulations can be considered as the starting points for development of feedback control laws for the different control problems stated in this paper. This paper presents the feedback control problems, and does not discuss in detail the methodology of solution techniques which could be used to solve these problems. However, for the sake of completeness a brief treatment of the three forms are included in this paper to show possible ways to design the controllers.  相似文献   

12.
We consider a scheduling problem in which n jobs are grouped into F groups and are to be processed on a single machine. A machine setup time is required when the machine switches from one group of jobs to the other. All jobs have a common due date that needs to be determined. The objective is to find an optimal common due date and an optimal sequence of jobs to minimize the sum of the cost of tardy jobs and the cost related to the common due date. We consider two cases:
  • 1.(i) the jobs have to be processed in groups; and
  • 2.(ii) the jobs do not have to be processed in groups.
Analytical results are presented and computational algorithms are developed.  相似文献   

13.
We develop a series of Ehrenfeucht games and prove the following results:
  • 1.(i) The first order theory of the divisible and indecomposable p-group, the first order theory of the group of rational numbers with denominators prime to p and the first order theory of a cyclic group of prime power order can be decided in 22cn log n Turing time.
  • 2.(ii) The first order theory of the direct sum of countably many infinite cyclic groups, the first order theory of finite Abelian groups and the first order theory of all Abelian groups can be decided in 22dn Turing space.
  相似文献   

14.
Bidirected graphs generalize directed and undirected graphs in that edges are oriented locally at every node. The natural notion of the degree of a node that takes into account (local) orientations is that of net-degree. In this paper, we extend the following four topics from (un)directed graphs to bidirected graphs:
  • –Erdős–Gallai-type results: characterization of net-degree sequences,
  • –Havel–Hakimi-type results: complete sets of degree-preserving operations,
  • –Extremal degree sequences: characterization of uniquely realizable sequences, and
  • –Enumerative aspects: counting formulas for net-degree sequences.
To underline the similarities and differences to their (un)directed counterparts, we briefly survey the undirected setting and we give a thorough account for digraphs with an emphasis on the discrete geometry of degree sequences. In particular, we determine the tight and uniquely realizable degree sequences for directed graphs.  相似文献   

15.
The performance of an iron-bath reactor has been studied using a comprehensive numerical model that combines a computational fluid dynamics approach for the gas phase and a heat and mass balance model for the bath. The model calculates:
  • •coal, ore, flux and oxygen consumption;
  • •post-combustion ratio (PCR);
  • •heat-transfer efficiency (HTE);
  • •off-gas temperature and composition;
  • •heat transfer and chemical reactions between gas and iron and slag droplets; and
  • •heat transfer between gas and bath, refractories and lance.
The model was validated with data reported by the Nippon Steel Corporation for a 100 t pilot plant, and the calculated and measured data are in good agreement. Modelling results showed that the dominant mechanisms of heat transfer from the gas to the bath are radiation to the slag surface and convection heat transfer to droplets.  相似文献   

16.
The paper studies equation (1.1) in two cases:
  • •(i)p ≡ 0,
  • •(ii)p ≠ 0.
In Case (i), the asymptotic stability of the solution x = 0 is studied; in Case (ii), the uniform boundedness and uniform ultimate boundedness of all solutions of (1.1) are proved.  相似文献   

17.
A procedure of the dynamic programming (DP) for the discrete-continuous problem of a route optimization is considered. It is possible to consider this procedure as a dynamic method of optimization of the towns choice in the well-known traveling salesman problem. In the considered version of DP, elements of a dynamic optimization are used. Two variants of the function of the aggregations of losses are investigated:
  • 1.(1) the additive functions;
  • 2.(2) the function characterizing the aggregation of losses in the bottle-neck problem.
  相似文献   

18.
In the modelisation of the dynamics of a sole population, an interesting issue is the influence of daily vertical migrations of the larvae on the whole dynamical process. As a first step towards getting some insight on that issue, we propose a model that describes the dynamics of an age-structured population living in an environment divided into N different spatial patches. We distinguish two time scales: at the fast time scale, we have migration dynamics and at the slow time scale, the demographic dynamics. The demographic process is described using the classical McKendrick model for each patch, and a simple matrix model including the transfer rates between patches depicts the migration process. Assuming that the migration process is conservative with respect to the total population and some additional technical assumptions, we proved in a previous work that the semigroup associated to our problem has the property of positive asynchronous exponential growth and that the characteristic elements of that asymptotic behaviour can be approximated by those of a scalar classical McKendrick model. In the present work, we develop the study of the nature of the convergence of the solutions of our problem to the solutions of the associated scalar one when the ratio between the time scales is ε (0 < ε ⪡ 1). The main result decomposes the action of the semigroup associated to our problem into three parts:
  • 1.(1) the semigroup associated to a demographic scalar problem times the vector of the equilibrium distribution of the migration process;
  • 2.(2) the semigroup associated to the transitory process which leads to the first part; and
  • 3.(3) an operator, bounded in norm, of order ε.
  相似文献   

19.
The authors use their recently proved integral inequality to obtain bounds for the covariance of two random variables
  • 1.in a general setup and
  • 2.for a class of special joint distributions.
The same inequality is also used to estimate the difference of the expectations of two random variables. Finally, the authors study the attainability of a related inequality.  相似文献   

20.
This paper proposes an alternate formulation of the traffic assignment problem using route flows and the shortest Origin-Destination (OD) travel times as the decision variables. This is accomplished through defining a gap function to convert the Nonlinear Complementarity Problem (NCP) formulation to an equivalent Mathematical Program (MP). This formulation has two advantages:
  • 1.(i) it can model assignment problems with general route costs which cannot be accomplished with existing formulations that use link-flow variables
  • 2.(ii) the objective function is smooth, convex, and bounded, which permits efficient MP algorithms for its solution.
Two solution approaches are developed to solve the proposed formulation. The first is based on a set of working routes, which are modeled as “known a priori” based on travelers' preferences or interviews. The second approach uses a column generation procedure to generate a new route in each iteration on a need basis. For each approach, we use a Successive Quadratic Programming (SQP) algorithm to solve for the solutions.To show that the formulation is correct, we solve a small example with a general route cost and compare it to the classic traffic equilibrium problem which assumes an additive route cost function. Finally, numerical results for a medium-sized network are provided to demonstrate the feasibility of the solution approach.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号