首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 22 毫秒
1.
《Discrete Optimization》2008,5(3):594-604
The problem of scheduling groups of jobs on a single machine under the group technology assumption is studied. Jobs of the same group are processed contiguously and a sequence independent setup time precedes the processing of each group. All jobs have a common fixed due date, which can be either unrestrictively large or restrictively small. The objective is to minimize the total weighted earliness–tardiness. Properties of optimal solutions are established, and dynamic programming algorithms are derived to solve several special cases of this problem. Computational experiments show that the algorithms can easily solve problems with 500 groups of jobs and each group has 10 to 50 jobs on a standard PC.  相似文献   

2.
This paper presents several procedures for developing non-delay schedules for a permutation flow shop with family setups when the objective is to minimize total earliness and tardiness. These procedures consist of heuristics that were found to be effective for minimizing total tardiness in flow shops without family setups, modified to consider family setups and the total earliness and tardiness objective. These procedures are tested on several problem sets with varying conditions. The results show that variable greedy algorithms are effective when solving small problems, but using a genetic algorithm that includes a neighbourhood defined by the sequence of batches of jobs belonging to the same set-up family is effective when solving medium- or large-sized problems. The results also show that if setup times can be reduced a significant reduction in total earliness and tardiness could result.  相似文献   

3.
This paper considers some scheduling problems with deteriorating jobs. The objectives are to minimize the makespan, the total completion time, the total absolute deviation of completion time, the earliness, tardiness, and due date penalty, the sum of earliness penalties subject to no tardy jobs, respectively. We also explore two resource constrained scheduling problems: how to minimize the resource consumption with makespan constraints and how to minimize the makespan with the total resource consumption constraints. Several polynomial time algorithms are proposed to optimally solve the problems with the above objective functions.  相似文献   

4.
This study addresses a class of single-machine scheduling problems involving a common due date where the objective is to minimize the total job earliness and tardiness penalties. A genetic algorithm (GA) approach and a simulated annealing (SA) approach utilizing a greedy local search and three well-known properties in the area of common due date scheduling are developed. The developed algorithms enable the starting time of the first job not at zero and were tested using a set of benchmark problems. From the viewpoints of solution quality and computational expenses, the proposed approaches are efficient and effective for problems involving different numbers of jobs, as well as different processing time, and earliness and tardiness penalties.  相似文献   

5.
The problem of scheduling in permutation flowshops is considered in this paper with the objectives of minimizing the sum of weighted flowtime/sum of weighted tardiness/sum of weighted flowtime and weighted tardiness/sum of weighted flowtime, weighted tardiness and weighted earliness of jobs, with each objective considered separately. Lower bounds on the given objective (corresponding to a node generated in the scheduling tree) are developed by solving an assignment problem. Branch-and-bound algorithms are developed to obtain the best permutation sequence in each case. Our algorithm incorporates a job-based lower bound (integrated with machine-based bounds) with respect to the weighted flowtime/weighted tardiness/weighted flowtime and weighted tardiness, and a machine-based lower bound with respect to the weighted earliness of jobs. The proposed algorithms are evaluated by solving many randomly generated problems of different problem sizes. The results of an extensive computational investigation for various problem sizes are presented. In addition, one of the proposed branch-and-bound algorithms is compared with a related existing branch-and-bound algorithm.  相似文献   

6.
In studies on scheduling problems, generally setup times and removal times of jobs have been neglected or by including those into processing times. However, in some production systems, setup times and removal times are very important such that they should be considered independent from processing times. Since, in general jobs are done according to automatic machine processes in production systems processing times do not differ according to process sequence. But, since human factor becomes influential when setup times and removal times are taken into consideration, setup times will be decreasing by repeating setup processes frequently. This fact is defined with learning effect in scheduling literature. In this study, a bicriteria m-identical parallel machines scheduling problem with a learning effect of setup times and removal times is considered. The objective function of the problem is minimization of the weighted sum of total completion time and total tardiness. A mathematical programming model is developed for the problem which belongs to NP-hard class. Results of computational tests show that the proposed model is effective in solving problems with up to 15 jobs and five machines. We also proposed three heuristic approaches for solving large jobs problems. According to the best of our knowledge, no work exists on the minimization of the weighted sum of total completion time and total tardiness with a learning effect of setup times and removal times.  相似文献   

7.
Scheduling with setup times and learning plays a crucial role in today's manufacturing and service environments where scheduling decisions are made with respect to multiple performance criteria rather than a single criterion. In this paper, we address a bicriteria single machine scheduling problem with job-dependent past-sequence-dependent setup times and job-dependent position-based learning effects. The setup time and actual processing time of a job are respectively unique functions of the actual processing times of the already processed jobs and the position of the job in a schedule. The objective is to derive the schedule that minimizes a linear composite function of a pair of performance criteria consisting of the makespan, the total completion time, the total lateness, the total absolute differences in completion times, and the sum of earliness, tardiness, and common due date penalty. We show that the resulting problems cannot be solved in polynomial time; thus, branch-and-bound (B&B) methods are proposed to obtain the optimal schedules. Our computational results demonstrate that the B&B can solve instances of various size problems with attractive times.  相似文献   

8.
The problem of scheduling jobs with distinct ready times and due dates in a single machine to minimise the total earliness and tardiness penalties is considered. A constructive heuristic, which determines the sequence of jobs and simultaneously inserts idle times, is proposed. Adjacent pairwise interchange is then applied to the schedule obtained. For problems involving at most 12 jobs the heuristic solutions are compared to optimal solutions. For larger problems with up to 80 jobs the heuristic is tested against a local search based on pairwise interchanges and four dispatching rules presented in the literature. In each case, idle times are optimally inserted.  相似文献   

9.
This paper is concerned with the problem of scheduling n jobs with a common due date on a single machine so as to minimize the total cost arising from earliness and tardiness. A general model is examined, in which earliness penalty and tardiness penalty are, respectively, arbitrary non-decreasing functions. Moreover, the model includes two important features that commonly appear in practical problems, namely, 1) earliness and tardiness are penalized with different weights which are job-dependent, and 2) the earliness (or tardiness) penalty consists of two parts, one is a variable cost dependent on the length of earliness (or tardiness), while the other is a fixed cost incurred when a job is early (or tardy). This model provides a general and flexible performance measure for earliness/tardiness scheduling, which has not been addressed before. We establish a number of results on the characterizations of optimal and sub-optimal solutions, and propose two algorithms based on these results. The first algorithm can find, under an agreeable weight condition, an optimum in time O(n2 Pn), and the second algorithm can generate a sub-optimum in time O(nPn), where Pn is the sum of the processing times. Further, we derive an upper bound on the relative error of the sub-optimal solution and show that, under certain conditions, the error tends to zero as n increases. Computational results are also reported to demonstrate the effectiveness of the algorithms proposed.  相似文献   

10.
This paper considers single machine scheduling problems with group technology (GT) and deteriorating jobs. A sequence independent setup is required to process a job from a different group and jobs in each group are processed together. We consider the case of jobs whose processing times are a decreasing function of their starting time. The objectives of scheduling problems are to minimize the makespan and the total completion time, respectively. We also provide polynomial time algorithms to solve these problems.  相似文献   

11.
This paper considers the problems of scheduling jobs on parallel identical machines where an optimal schedule is defined as one that gives the smallest maximum tardiness (or the minimum number of tardy jobs) among the set of schedules with optimal total flow-time (the sum of the completion times of all jobs). We show that these problems are unary NP-Hard, develop lower bounds for these two secondary criteria problems, and describe heuristic algorithms for their solution. Results of a computational study show that the proposed heuristic algorithms are quite effective and efficient in solving these hierarchical criteria scheduling problems.  相似文献   

12.
This paper considers single-machine scheduling problems with job delivery times where the actual job processing time of a job is defined by a function dependent on its position in a schedule. We assume that the job delivery time is proportional to the job waiting time. We investigate the minimization problems of the sum of earliness, tardiness, and due-window-related cost, the total absolute differences in completion times, and the total absolute differences in waiting times on a single-machine setting. The polynomial time algorithms are proposed to optimally solve the above objective functions. We also investigate some special cases of the problem under study and show that they can be optimally solved by lower order algorithms.  相似文献   

13.
In this paper, we consider a machine scheduling problem where jobs should be completed at times as close as possible to their respective due dates, and hence both earliness and tardiness should be penalized. Specifically, we consider the problem with a set of independent jobs to be processed on several identical parallel machines. All the jobs have a given common due window. If a job is completed within the due window, then there is no penalty. Otherwise, there is either a job-dependent earliness penalty or a job-dependent tardiness penalty depending on whether the job is completed before or after the due window. The objective is to find an optimal schedule with minimum total earliness–tardiness penalty. The problem is known to be NP-hard. We propose a branch and bound algorithm for finding an optimal schedule of the problem. The algorithm is based on the column generation approach in which the problem is first formulated as a set partitioning type formulation and then in each branch and bound iteration the linear relaxation of this formulation is solved by the standard column generation procedure. Our computational experiments show that this algorithm is capable of solving problems with up to 40 jobs and any number of machines within a reasonable computational time.  相似文献   

14.
This paper considers the problem of scheduling a given number of jobs on a single machine to minimize the sum of maximum earliness and maximum tardiness when sequence-dependent setup times exist (1∣ST sd ETmax). In this paper, an optimal branch-and-bound algorithm is developed that involves the implementation of lower and upper bounding procedures as well as three dominance rules. For solving problems containing large numbers of jobs, a polynomial time-bounded heuristic algorithm is also proposed. Computational experiments demonstrate the effectiveness of the bounding and dominance rules in achieving optimal solutions in more than 97% of the instances.  相似文献   

15.
In this paper we consider the single machine scheduling problem with truncated job-dependent learning effect. By the truncated job-dependent learning effect, we mean that the actual job processing time is a function which depends not only on the job-dependent learning effect (i.e., the learning in the production process of some jobs to be faster than that of others) but also on a control parameter. The objectives are to minimize the makespan, the total completion time, the total absolute deviation of completion time, the earliness, tardiness and common (slack) due-date penalty, respectively. Several polynomial time algorithms are proposed to optimally solve the problems with the above objective functions.  相似文献   

16.
This paper deals with serial-batching scheduling problems with the effects of deterioration and learning, where time-dependent setup time is also considered. In the proposed scheduling models, all jobs are first partitioned into serial batches, and then all batches are processed on a single serial-batching machine. The actual job processing time is a function of its starting time and position. In addition, a setup time is required when a new batch is processed, and the setup time of the batches is time-dependent, i.e., it is a linear function of its starting time. Structural properties are derived for the problems of minimizing the makespan, the number of tardy jobs, and the maximum earliness. Then, three optimization algorithms are developed to solve them, respectively.  相似文献   

17.
在工业生产中,随着员工操作技能的熟练程度的增加,对于相同的任务越往后加工,所花的时间将会减少。 同时,为了尽早完工,管理者也会考虑给加工工件分配一定量的额外资源来缩短工件加工时间。 本文基于以上实例,讨论了工件的实际加工时间既具有学习效应又依赖所分配资源的单机排序问题。 在问题中,假设工件的学习效应是之前已加工工件正常加工时间和的指数函数。 同时随着分配给工件资源量的增加,工件的实际加工时间呈线性减少,所需费用呈线性增加。对这一排序模型,主要探讨以下五个目标函数:最小化最大完工时间与资源消耗量总费用的和;最小化总完工时间与资源消耗量总费用的和;最小化加权总完工时间与资源消耗量总费用的和;最小化总提前、总延误、总共同交货期与资源消耗量总费用的和以及最小化总提前、总延误、总松弛交货期与资源消耗量总费用的和。 本文对前三个目标函数相应的排序问题给出了多项式时间可求解的算法。 对后两个目标函数所涉及的排序问题借助于指派问题分别给出了时间复杂性为O(n3)的算法。  相似文献   

18.
A scheduling problem with a common due-window, earliness and tardiness costs, and identical processing time jobs is studied. We focus on the setting of both (i) job-dependent earliness/tardiness job weights and (ii) parallel uniform machines. The objective is to find the job allocation to the machines and the job schedule, such that the total weighted earliness and tardiness cost is minimized. We study both cases of a non-restrictive (i.e. sufficiently late), and a restrictive due-window. For a given number of machines, the solutions of the problems studied here are obtained in polynomial time in the number of jobs.  相似文献   

19.
We consider single machine scheduling problems with deteriorating jobs and SLK/DIF due window assignment, where the deteriorating rates of jobs are assumed to be job-dependent. We consider two different objectives under SLK and DIF due window assignment, respectively. The first objective is to minimise total costs of earliness, tardiness, due window location and due window size, while the second objective is to minimise a cost function that includes number of early jobs, number of tardy jobs and the costs for due window location and due window size. We study the optimality properties for all problems and develop algorithms for solving these problems in polynomial time.  相似文献   

20.
Scheduling problems involving both earliness and tardiness costs have received significant attention in recent years. This type of problem became important with the advent of the just-in-time (JIT) concept, where early or tardy deliveries are highly discouraged. In this paper we examine the single-machine scheduling problem with a common due date. Performance is measured by the minimization of the sum of earliness and tardiness penalties of the jobs. Since this problem is NP-hard, we propose a tabu search-based heuristic and a genetic algorithm which exploit specific properties of the optimal solution. Hybrid strategies are also analyzed to improve the performance of these methods. The proposed approaches are examined through a computational comparative study with 280 benchmark problems with up to 1000 jobs.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号