首页 | 官方网站   微博 | 高级检索  
     

Tritium Burn-up Depth and Tritium Break-Even Time
作者姓名:李承跃  邓柏权  黄锦华  严建成
作者单位:[1]School of Physical Electronics, University of Electronic Science and Technology of China, Chengdu 610054 [2]Southwestern Institute of Physics, PO Box 432, Chengdu 610041
摘    要:Similarly to but quite different from the xenon poisoning effects resulting from fission-produced iodine during the restart-up process of a fission reactor, we introduce a completely new concept of the tritium burn-up depth and tritium break-even time in the fusion energy research area. To show what the least required amount of tritium storage is used to start up a fusion reactor and how long a time the fusion reactor needs to be operated for achieving the tritium break-even during the initial start-up phase due to the finite tritium breeding time that is dependent on the tritium breeder, specific structure of breeding zone, layout of coolant flow pipe, tritium recovery scheme, extraction process, the tritium retention of reactor components, unrecoverable tritium fraction in breeder, leakage to the inertial gas container, and the natural decay etc., we describe this new phenomenon and answer this problem by setting up and by solving a set of equations, which express a dynamic subsystem model of the tritium inventory evolution in a fusion experimental breeder (FEB). It is found that the tritium burn-up depth is 317g and the tritium break-even time is approximately 240 full power days for FEB designed detail configuration and it is also found that after one-year operation, the tritium storage reaches 1.18kg that is more than the least required amount of tritium storage to start up three of FEB-like fusion reactors.

关 键 词:  裂变反应器  融合能量  理论物理
收稿时间:2005-12-05
修稿时间:2005-12-05

Tritium Burn-up Depth and Tritium Break-Even Time
LI Cheng-Yue,DENG Bai-Quan,HUANG Jin-Hua,YAN Jian-Cheng.Tritium Burn-up Depth and Tritium Break-Even Time[J].Chinese Physics Letters,2006,23(8):2056-2058.
Authors:LI Cheng-Yue  DENG Bai-Quan  HUANG Jin-Hua  YAN Jian-Cheng
Affiliation:1.School of Physical Electronics, University of Electronic Science and Technology of China, Chengdu 610054;2.Southwestern Institute of Physics, P0 Box 432, Chengdu 610041
Abstract:Similarly to but quite different from the xenon poisoning effects resulting from fission-produced iodine during the restart-up process of a fission reactor, we introduce a completely new concept of the tritium burn-up depth and tritium break-even time in the fusion energy research area. To show what the least required amount of tritium storage is used to start up a fusion reactor and how long a time the fusion reactor needs to be operated for achieving the tritium break-even during the initial start-up phase due to the finite tritium breeding time that is dependent on the tritium breeder, specific structure of breeding zone, layout of coolant flow pipe, tritium recovery scheme, extraction process, the tritium retention of reactor components, unrecoverable tritium fraction in breeder, leakage to the inertial gas container, and the natural decay etc., we describe this new phenomenon and answer this problem by setting up and by solving a set of equations, which express a dynamic subsystem model of the tritium inventory evolution in a fusion experimental breeder (FEB). It is found that the tritium burn-up depth is 317g and the tritium break-even time is approximately 240 full power days for FEB designed detail configuration and it is also found that after one-year operation, the tritium storage reaches 1.18kg that is more than the least required amount of tritium storage to start up three of FEB-like fusion reactors.
Keywords:28  52  -s  28  52  Cx  28  52  Av
本文献已被 维普 等数据库收录!
点击此处可从《中国物理快报》浏览原始摘要信息
点击此处可从《中国物理快报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号