首页 | 官方网站   微博 | 高级检索  
     

预制构件流水车间订单接受与调度的集成优化
引用本文:熊福力,储梦伶.预制构件流水车间订单接受与调度的集成优化[J].运筹与管理,2022,31(8):70-76.
作者姓名:熊福力  储梦伶
作者单位:西安建筑科技大学 信息与控制工程学院,陕西 西安 710055
基金项目:国家自然科学基金资助项目(61473216);陕西省自然科学基础研究计划项目(2020JM-489,2015JM6337);陕西省教育厅自然科学基金项目(17JK0459);西安建筑科技大学自然科学基础研究项目(ZR18049)
摘    要:针对预制构件生产管理过程中订单工期紧和生产能力不足的问题,在充分考虑中断和不可中断工序,串行和并行工序等复杂工况特点的基础上,以最大化净利润为目标,建立了一种订单接受与调度集成优化模型。鉴于问题的NP难性和模型的高度非线性,通过集成问题性质、构造启发式、邻域搜索和破坏-构造机制,提出了一种混合加速迭代贪婪搜索框架。其中,在调度构造阶段,为提高算法求解质量和搜索效率,设计了两种融合订单插入操作性质的加速构造策略。计算结果显示,与混合遗传禁忌搜索算法,遗传算法以及禁忌搜索算法相比,本文所提算法具有更好的求解质量和搜索效率。同时验证了所提出的加速构造策略能够有效减少算法运行时间。该研究有望显著提高预制生产企业净利润和客户满意度。

关 键 词:预制构件流水车间  订单接受与调度  混合迭代贪婪算法  加速构造策略  
收稿时间:2020-08-16

Integrated Optimization of Order Acceptance and Scheduling for Precast Permutation Flow Shop
XIONG Fuli,CHU Meng-ling.Integrated Optimization of Order Acceptance and Scheduling for Precast Permutation Flow Shop[J].Operations Research and Management Science,2022,31(8):70-76.
Authors:XIONG Fuli  CHU Meng-ling
Affiliation:School of Information and Control Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China
Abstract:To deal with the problems of tight order due date and limited production capacity in the precast production system, an integrated optimization model for order acceptance and scheduling is established to maximize the total net revenue based on fully considering the characteristics of complex production processes, such as interruptible and uninterruptible processes, serial and parallel situations. In view of the NP hardness of the problem and the high nonlinearity of the model, a hybrid iterated greedy (HIG) framework is proposed by integrating the properties of the schedules, constructive heuristic, local search and mechanism of destruction-construction. Aiming to improve the solution quality and search efficiency of the algorithm, in the construction steps of the proposed algorithms, two speedup strategies are designed by using order insertion properties. Computational results show that the proposed algorithms perform better than hybrid genetic algorithm and tabu search (GA_TS), genetic algorithm (GA) and tabu search(TS). It also demonstrates that the speedup strategies can effectively shorten the running time of the algorithms, which could improve the total net revenue and customers' satisfaction of prefabrication enterprises.
Keywords:precast permutation flow shop  order acceptance and scheduling  hybrid iterated greedy algorithm  speedup construction strategies  
点击此处可从《运筹与管理》浏览原始摘要信息
点击此处可从《运筹与管理》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号