首页 | 官方网站   微博 | 高级检索  
     

考虑非周期检测的视情维修与备件订购联合策略优化
引用本文:赵斐,康建设,王雷震,张新辉,张建.考虑非周期检测的视情维修与备件订购联合策略优化[J].运筹与管理,2021,30(9):31-37.
作者姓名:赵斐  康建设  王雷震  张新辉  张建
作者单位:1.东北大学 工商管理学院,辽宁 沈阳 110819;2.陆军工程大学 石家庄校区装备指挥与管理系,河北 石家庄 050003;3.中车唐山机车车辆有限公司,河北 唐山 063000
基金项目:国家自然科学基金资助项目(71701038);教育部人文社会科学研究一般项目(16YJC630174);河北省自然科学基金资助(G2019501074);中央高校基本科研业务专项资金(N2123019)
摘    要:针对单部件系统/关键部件提出视情维修与备件订购联合策略,其中系统退化服从两阶段延迟时间过程且采用非周期检测策略,退化初期以检测间隔T1检查系统状态,而在第一次识别缺陷状态时,缩短检测周期为T2、订购备件且进行不完美维修;若系统在随后的退化中被识别处于缺陷状态,执行不完美维修直至超过阈值次数Nmax并采取预防性更换,但若在检测周期内发生故障则进行更换。根据系统状态和备件状态分析各种可能更新事件及相应的联合决策,利用更新报酬理论构建最小化单位时间内期望成本的目标函数,优化T1,T2, Nmax。与对比模型策略相比,算例结果表明所提出的联合策略能有效降低单位时间内的期望成本。

关 键 词:状态维修  非周期检测  不完美维修  备件订购  延迟时间  
收稿时间:2019-03-18

Joint Policy Optimizationof Condition-Based Maintenance and Spare Ordering Considering Non-Periodic Inspection
ZHAO Fei,KANG Jian-she,WANG Lei-zhen,ZHANG Xin-hui,ZHANG Jian.Joint Policy Optimizationof Condition-Based Maintenance and Spare Ordering Considering Non-Periodic Inspection[J].Operations Research and Management Science,2021,30(9):31-37.
Authors:ZHAO Fei  KANG Jian-she  WANG Lei-zhen  ZHANG Xin-hui  ZHANG Jian
Affiliation:1. School of Business Administration, Northeastern University, Shenyang 110819, China;2. Equipment Command and Administration Department, Shijiazhuang Campus of Army Engineering University, Shijiazhuang 050003, China;3. CRRC Tangshan Co., Ltd., Tangshan 063000, China
Abstract:A jointly policy of condition-based maintenance (CBM) and spare ordering is proposed for a single-unit system/critical component subject to a two-stage delay-time process. A non-periodic inspection policy with various intervals is presented, in which the system is detected with the relatively longer interval T1 during the initial deterioration process, but with a shorted interval T2 after the defective state is firstly found by an inspection. While, the spare is ordered and imperfect maintenance (IPM) is carried out. In the subsequent deterioration process, IPM is required and performed once the defective state is revealed until the number of IPM exceeds the threshold Nmax; then, a preventive replacement is needed. If a failure occurs within the inspection interval, a corrective replacement arises. According to the system's state and the spare's availability, all possible renewal events and the corresponding joint decisions are discussed and then the objective function to minimize the expected cost per unit time is established using the renewal award theorem for optimizing T1,T2, Nmax. The results fromthe numerical example indicate that the proposed policy decreases the expected cost per unit time compared to the comparative models.
Keywords:condition-based maintenance  non-periodic inspection  imperfect maintenance  spare ordering  delay-time  
本文献已被 CNKI 等数据库收录!
点击此处可从《运筹与管理》浏览原始摘要信息
点击此处可从《运筹与管理》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号