首页 | 官方网站   微博 | 高级检索  
     


Construction and cosmic-ray test of the new inner drift chamber for BESIII
Authors:Yong-ji Xie  Zhong-hua Qin  Xiao-yan Ma  Jian Zhang  Ling-hui Wu  Wan Xie  Ming-yi Dong  Jing Dong  Xiao-lu Ji  Xiao-shan Jiang  Qun Ou-yang  Ke-jun Zhu  Yuan-bo Chen
Abstract:A new inner drift chamber has been built which can replace the aged part of the BESⅢ drift chamber when needed. The design of the new inner drift chamber can minimize the ineffective area in the very forward and backward region and hence reduce the background event rate. With this design, the new inner drift chamber is expected to have a longer lifetime and improved performance due to the lower occupancy. The endplates and the cylinder were machined with high precision. Wire stringing was performed after the mechanical structure was assembled, and good quality of wire stringing was ensured by measurement of the tension and leakage current of the wires. After completion of the physical construction of the new chamber, a cosmic-ray test was carried out to test its performance. The results of the cosmic-ray test show that the new inner chamber achieves a spatial resolution of 127 μ and a dE/dx resolution of 6.4%, which satisfies the design specifications.
Keywords:BESIII  drift chamber  new inner drift chamber  cosmic-ray test
本文献已被 CNKI 等数据库收录!
点击此处可从《中国物理C(英文版)》浏览原始摘要信息
点击此处可从《中国物理C(英文版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号